Montioring and Modeling of Tandem Breakwater System at Hammond, IN
A tandem breakwater system was constructed in 1989-90 to provide protection for a large marina at Hammond, IN, at the south end of Lake Michigan. A five year monitoring program (1993-98),...

Design and Construction of the Pier J Breakwaters at the Port of Long Beach, California
Several different alternatives to mitigate surge activity were investigated. The most acceptable solution was a pair of new breakwaters that altered the basin geometry to change the basin...

Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...

St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...

Applications of Multibeam Echo Sounding with Topographic Mapping for Monitoring of Rubble Mound Breakwaters
Analysis of data from the breakwater monitoring program indicates the integration of multibeam survey capability with the increased accuracy of OTF DGPS positioning and advanced data management...

Application of Multibeam Echo Sounding and Side Scan Sonar for Mapping of Shoreline Protection Revetments
The use of multibeam survey methodology coupled with high precision positioning systems for the mapping of shoreline protection features and the adjacent offshore areas allows development...

Strength from Within
After decades of being continuously struck by rockfalls and wayward vehicles, Knapps Hill Tunnel�a highway structure built in 1936 and located on state Route 97A in central Washington...

An Arbor for Art
The new $50-million, 153,000 sq ft (14,200 m�) building for the Modern Art Museum of Fort Worth will provide the museum with more than five times its current gallery space. The design...

Protecting the Ports
Increased security concerns are prompting the nation's ports to rethink the design of their points of entry, especially at their terminals. Civil engineers are being called...

Geotechnical Aspects of Beach Restoration
Large-scale beach restoration undertaken by the U.S. Army Corps of Engineers in Florida requires millions of cubic yards of beach quality sand. Exploration for these sand resources starts...

Characteristics and Implications of Relict Carbonate Paleoshorelines
Throughout the Florida-Bahamas region, the accumulation of coastal carbonate deposits, excepting the present highstand, appears to be episodic. Back through time these deposits provide...

Act of Triumph
The dramatic, crescent-shaped fabric roof of the soccer stadium built on the Korean island of Cheju for this year's World Cup proved to be the structure's most...

Training Grounds
A state-of-the-art training facility at a Texas community college is ready to train fire and rescue personnel to cope with disasters ranging from fuel fires and floods to collapsing structures...

Non-Destructive Excavating Around Pipelines and Challenging Conditions
Hydrovac technology provides engineers and contractors with a unique solution for non-destructive excavating around sensitive buried lines. As a non-mechanical excavating method, it is...

Economic Restoration of Concrete Infrastructure at Jefferson Parish, Louisiana
United States municipalities are spending hundreds of millions of dollars annually tore place and repair corroded concrete infrastructures in wastewater systems. Structures such as wet...

Capacity, Management, Operations and Maintenance (CMOM) Overview
Attendees will have a better understanding of the new policy and the benefits of compliance. The purpose of the CSO Rule or CMOM by EPA is creating a wave of activity across the country....

Calendar: Bridges 2003 Calendar
Featured bridges are: Logan Mills Bridge (PA); Bayonne Bridge (NJ & NY); Puente de Alc�ntara (Spain); Hayden Bridge (OR); Bridge at Southharbourgate (Netherlands); Hanging Lake...

The Watershed Modeling System
The Watershed Modeling System (WMS) is a comprehensive environment for hydrologic analysis developed by the Environmental Modeling Research Laboratory (EMRL) at Brigham Young University...

Implementation of the Phase II Stormwater NPDES Permits
In the 1987 amendments to the Clean Water Act, Congress directed the United States Environmental Protection Agency (EPA) to establish a permitting framework under the National Pollutant...

Probabilistic Simplified and Detailed Subsurface Drainage Water Quality Modeling of Nitrate Leaching
A transparent uncertainty structure is derived for simplified and detailed conceptual nitrate leaching as a result of a probabilistic modelling procedure. The uncertainty structure consists...

 

 

 

 

Return to search